For the Horde!!

2014. 11. 25. PPP

 

 

 PPP 디버그 ( 라인 다운 -> 업 )

Seoul#debug ppp authentication

PPP authentication debugging is on

Seoul#conf t

Enter configuration commands, one per line. End with CNTL/Z.

Seoul(config)#int s 0/0/1

Seoul(config-if)#sh

 

%LINK-5-CHANGED: Interface Serial0/0/1, changed state to administratively down


%LINEPROTO-5-UPDOWN: Line protocol on Interface Serial0/0/1, changed state to down


00:25:22: %OSPF-5-ADJCHG: Process 1, Nbr 10.1.13.2 on Serial0/0/1 from FULL to DOWN, Neighbor Down: Interface down or detached


Seoul(config-if)#no sh

 

%LINK-5-CHANGED: Interface Serial0/0/1, changed state to up


Serial0/0/1 Using hostname from interface PAP


Serial0/0/1 Using password from interface PAP


Serial0/0/1 PAP: O AUTH-REQ id 17 len 15


Serial0/0/1 PAP: Phase is FORWARDING, Attempting Forward

 

Serial0/0/1 PAP: I AUTH-REQ id 17 len 15


Serial0/0/1 PAP: Authenticating peer


Serial0/0/1 PAP: Phase is FORWARDING, Attempting Forward

 

Serial0/0/1 Using hostname from interface PAP


Serial0/0/1 Using password from interface PAP


Serial0/0/1 PAP: O AUTH-REQ id 17 len 15


Serial0/0/1 PAP: Phase is FORWARDING, Attempting Forward


%LINEPROTO-5-UPDOWN: Line protocol on Interface Serial0/0/1, changed state to up

 

00:25:43: %OSPF-5-ADJCHG: Process 1, Nbr 10.1.13.2 on Serial0/0/1 from LOADING to FULL, Loading Done

 

'Study > Cisco' 카테고리의 다른 글

2014. 11. 27. Frame-relay [PPP, Multi]  (0) 2014.11.27
2014. 11. 25. Frame-relay 1 : 多  (0) 2014.11.26
2014. 11. 24. PAT  (0) 2014.11.24
2014. 11. 20. NAT Dynamic  (0) 2014.11.20
2014. 11. 19. Access-List 실습 ( VTY )  (0) 2014.11.19